DearestJustin Justin,
I appreciate your response. I shall call you later today.
I need you to study this summaryand get back to me so we proceed on this project. This I have prepared before hand. Let me know if your existing properties is okay for this project or we get a land and develop it.
First, I want you to understand that this project is something big. I need a hand from your country to see me through working under my payroll as my Principal Partner.
I want you to read through the Project Summary before the MOU which will carry the Terms and Conditions come up. Study this carefully and get back to me so that the MOU will be prepared and sent to you with my profiles/details.
As you have requested in your first e-mail to me, I deem it fit to send you a detailed summary of the project and the entire transaction including the transfer of the fund to your country which I have prepared before hand. Please, let me have a direct working number to call you on for further details.
Do call me on +447045748145 so we discuss of the investment opportunities you have said about in your response to me as soon as you get this email.
The choice of the project is left for you to decide but it must be in a nice spot where flow of rich client is guaranteed in any of the areas in your country around you.
Below is the Hotel Plan information, go through it and get back to me as soon as possible then we proceed from there on how we go about getting the funds for the execution of the project into your custody.
TOURIST HOTEL COMPANY CONSTRUCTION PROJECT SUMMARY
Location/ capital city.
Project Type /Hotel Construction
Project Type /HOUSE OR COMPANY Construction Project
Executing Firm/Agency. Any Hotel construction company we both decide.
Project Outline:
The Tourist Hotel will be located in the heart of capital business city of your country and will offer a full range of meeting facilities, as well as a communication and business center, restaurant and recreation facilities.
Technical Description:
This hotel building will accommodate the following facilities:
Lobby, cafe, bar, and administrative facilities 150-seat restaurant Deluxe single and double rooms..
Sports center including dressing rooms, showers, sauna, and swimming pool.
Security building Infrastructure works include:
Electrical wiring Sewage and wastewater system Gas pipes
Plastic water pipes
Centralized heating and hot water
Water reservoir with 5-day water reserve
Power generator
Fire protection system
Security system, perimeter walls, gates, and guard houses.
Communication systems:
Training and recruitment of the hotel staff prior to the hotel opening and employment of about 300 Staff.
Project Site:
The hotel will be built in the country capital city at any Secure area..
Project Status/Timeline:
The construction phase will begin in two months from now and take approximately 18-24 months to complete.
Equipment and Services:
The consortium is especially interested in purchasing and importing required hotel interior furnishings, fixtures, equipment, and security installations, which will likely include the following:
Headboards and mattress sets Nightstands and armoires
Chairs and sofas Desks and tables Audio visual equipment Refrigerators, cookers and other appliances Mirrors and art Lamps and lighting fixtures.
Elevators
Security systems (cameras, alarms, electronic and metal detectors, etc.)
Gates and perimeter walls
Curtain rails
Balustrading
Wine racks
Fireplaces
Plumbing
Heating and ventilation
Automated climate control system
Computers and hospitality sector specific software (electronic booking and reservation systems)
Gym equipment (weightlifting machines, etc.)
Swimming pool design and equipment.
I will be happy if you can be able to secure a good place for this business in your country. However, I have the funds ready for this project.
Based on issue of security with you, to gather more trust as this is solely based on trust. My lawyer advised me that it would be better that we meet ourselves in order to have some understanding and at the same time sign an agreement binding us together in this transaction.
Based on this, I had made up my mind for us to have the meeting as he advised which will give us an opportunity of knowing ourselves for better understanding and practical trust.
Immediately I hear from you, I shall send to you a Memorandum of Understanding and negotiate an immediate transfer of the funds into your custody for the commencement of this project. Do not fail to email on receipt of this email or call me on +447045748145. And let me have a number to reach you on.
I need the details below to get the MOU/PARTNERSHIP DEED prepared.
1. YOUR FULL NAMES
2. YOUR CONTACT ADDRESS:
3. TELEPHONE/CELL PHONE NUMBER.
Thanks and Gods bless.
Dr. Tony Benson..
|